Introduction
AK2 sensor design based on Elmos chip E524.17, matching the existing mass production transducer, embedded with ultrasonic algorithm software, integrating transmitting, receiving and processing, compact structure design, stable and reliable performance.
Function
According to the design requirements of AK2 specifications, all sensors rang from 10 to 500cm(φ 75*1000mm PVC pole)
System Architecture
The prevailing OEM system architecture is Domain Control Ultrasonic system. To drive 12 sensors to execute PDC, PHA and RPA functions ( including parking space scanning, track tracking, obstacle location memory, turning memory).
Specification
Existing VS AK2 ultrasonic sensor
Item | Existing | AK2 ultrasonic |
Max. detection range | 450cm | >500cm |
Blind area | 20-30cm | 0~10cm |
Measurement distance accuracy | ≤5cm | ≤1cm |
Measurement distance resolution | 1cm | ≤1cm |
Functional safety | QM | ASIL B |
Sensor deafness detection | Unable | Special diagnostic |
Ice, snow and other cover detection | Low detection probability | Special diagnostic |
Connection | P2P | P2P (DSI3 Bus) |
Sensor structure | No standard | Standard size |
Request A Quote
Q: I am a whole seller, I want to buy your parking sensor, do you have it for aftermarket?
+
A: Yes, Coligen make parking sensor for both OE& aftermarket, 90% is for OE and 10% for aftermarket, both with OE quality.
Q: My customers want a cost down solution, can you offer us a good solution with cheap price?
+
A: Yes, Coligen have NON-ECU parking sensor system, which supports maximum 8 parking sensors( FPAS4+RPAS4).
Q: Can your parking sensor be used for both PV&CV application?
+
A: Yes, PV(12V)& CV(24V), we will use adopt the right power management IC. And we will use the right bracket for different application. But need customer to provide the bumper data so that it can achieve the best performance.
Q: If your parking sensor can be used for APA application?
+
A: Yes, we have the new generation AK2 sensor. Which have longer detection range and better performance, especially for APA and L2~L3 application.
Q: My customer always request urgent delivery, how long it will take upon my order and down payment?
+
A: Coligen have 10 automatic production lines with huge capacity, normally it will take around 25~30 days. But there is some lead time materials which will take longer time, please send us your forecast or place order in advance.